In the scope of conception and elaboration of preliminary projects and execution of changes/improvement in the processing line of paper and board waste at Suldouro – Sermonde facilities, BoG – EC is in charge of the contribution proposal in its expertise area – environmental engineering. The work includes the definition of technical specifications of the equipment to be replaced, procurement of potential suppliers, verification and validation of received proposals’ adequacy in the face of established requirements by Suldouro, and elaboration of a descriptive memory with equipment specifications, its conjunction with the other expertise areas of engineering, and inputs for the definition of sorting unit final layout to be developed by ENCKE.
This work also includes the elaboration of the Prevention Plan and Management of Construction and Demolition Waste, in the pre-construction phase, in line with the interventions that may be identified as necessary in the space where the Blue Line is installed.
Environmental Management
Portugal
March 2022 – in progress
ENCKE – Engineering & Consulting